Shift pattern review checklist

This page provides an original checklist for reviewing shift patterns from a fatigue-risk perspective. It supports review and can help structure a discussion between planners, supervisors, safety teams, and workforce representatives.

Important: This checklist is not legal advice, not a substitute for official standards, and not a compliance certificate. A completed checklist does not prove a roster is safe, does not guarantee compliance, and does not replace competent person judgement or a full fatigue risk assessment. Adapt it to your organisation and sector.

  1. Scope the review — which roles, locations, contracts, and time period does this pattern cover?
  2. Work through each section — use the prompts to ask whether relevant fatigue factors have been considered.
  3. Record findings — note concerns, assumptions, and who reviewed them.
  4. Compare options — if redesigning a roster, review alternatives side by side.
  5. Consult workers — ask how tiring the pattern feels in practice; do not rely on the checklist alone.
  6. Escalate — where exposure appears elevated, ensure documented review by a competent person before proceeding.
  7. Revisit — reassess when operations change, overtime increases, or credible fatigue reports arise. See planned vs actual fatigue.

For wider roster design principles, see roster design principles.

Check whether:

  • Start and finish times are recorded accurately for each duty in the pattern
  • Early-morning starts coincide with the circadian low — see early starts and fatigue
  • Late finishes compress sleep before the next duty
  • Finish times allow realistic recovery before the next assignment
  • The pattern has been reviewed shift by shift, not only as a weekly average

Check whether:

  • Which duties qualify as night work under your policy and any applicable working time provisions
  • Night blocks are separated by adequate recovery where possible — see night shift fatigue
  • Rotation between day and night is manageable for the operation
  • Permanent night patterns have been considered separately from rotating patterns
  • Night work has been included in fatigue risk assessment where relevant

Check whether:

  • Repeated early starts occur in the pattern
  • Workers have realistic sleep opportunity before early duties
  • Early starts follow late finishes anywhere in the preceding days (quick returns)
  • Travel before an early start has been considered — see door-to-door fatigue planning checklist

Check whether:

  • The gap between end of one duty and start of the next allows adequate rest
  • Quick returns are identified and reviewed, not hidden in the schedule
  • Rest days are genuinely free from call-in or unpaid preparation where possible
  • Recovery between demanding blocks is proportionate — see consecutive shifts and recovery

Check whether:

  • Runs of consecutive duties are identified
  • Recovery days are planned after demanding sequences
  • Overtime or overruns could extend consecutive exposure beyond the plan
  • Cumulative load has been considered across the full schedule, not single days

Check whether:

  • Breaks are planned, realistic, and achievable during normal operations
  • Breaks are likely to be taken — not routinely missed during busy periods
  • Long duties have sensibly spaced recovery opportunities
  • Missed or shortened breaks are treated as a reason to reassess — see breaks and recovery during shifts

Check whether:

  • Task demand during the shift matches what was assumed in any model or assessment
  • Vigilance-heavy, monotonous, or physically demanding work is identified
  • Peak workload periods (outages, possessions, programme pressure) are reflected
  • Workload is considered alongside timing — not in isolation

Check whether:

  • Outward and return travel are included in fatigue planning where significant
  • Total door-to-door burden has been estimated for typical and worst-case days
  • Driving after a long or night duty has been considered
  • See door-to-door time and the door-to-door planning checklist

Check whether:

  • Planned overtime or extended duties are identified in the pattern
  • Disruption-driven overruns are likely in this operation
  • Actual hours are monitored against the plan — see planned vs actual fatigue
  • The pattern still looks reasonable if typical overruns occur

Check whether:

  • Workers have been consulted on how tiring the pattern feels
  • A reporting route exists for fatigue concerns — see worker fatigue reporting
  • Credible reports would trigger review even if a model score looks acceptable
  • Workforce representatives are involved where appropriate

Where your organisation uses fatigue modelling:

Check whether:

Field Entry
Pattern / roster reviewed
Roles and locations covered
Reviewer(s)
Competent person (if required)
Date
Key concerns identified
Actions agreed
Next review date / trigger
  • Does not prove legal compliance or complete a statutory risk assessment on its own
  • Does not make a roster safe or approve work to proceed
  • Does not replace competent person judgement or sector-specific requirements
  • Does not reproduce ORR, Network Rail, or other industry checklists verbatim
  • Does not set universal shift lengths, rest limits, or model thresholds

Sector-specific requirements vary. Organisations subject to contractual standards should review those requirements separately.